Technical Document and Company News

Technique

What is primary injection testing?

Primary injection testing is a fundamental process for ensuring your electrical protection systems are reliable. It verifies the entire circuit, giving you peace of mind that your equipment will work when it matters most.

Read More »
Technique

Signs Your Transformer Insulating Oil Needs Replacement or Reclamation?

Aging transformer oil threatens your equipment’s safety. A sudden failure can cause catastrophic damage and costly downtime. Knowing the signs for oil replacement or reclamation prevents this. The key signs include low dielectric strength, high moisture content, increased acidity, poor color, and concerning results from Dissolved Gas Analysis (DGA).

Read More »
Technique

How Do VLF Testers Provide Essential Cable Solutions for Modern Power Grids?

VLF testing is the key to maintaining uptime and asset health. VLF testers are crucial for renewables because they effectively test the vast underground cable networks in wind and solar farms. This preventative maintenance identifies insulation weaknesses in MV cables, preventing costly outages and ensuring uninterrupted power generation, which is vital for grid stability and project profitability.

Read More »
Uncategorized

How is Transformer Turn Ratio Tester Used in Different Industries?

A transformer turn ratio (TTR) tester is used to measure the ratio of the number of turns in the primary winding to the number of turns in the secondary winding of a transformer. It helps detect faults in the transformer, such as shorted or open windings, and ensures the transformer is operating correctly.

Read More »
pt_PTPortuguês

Inquiry Now