Τεχνικά έγγραφα και εταιρικά νέα

Τεχνική

Partial Discharge Test Set: A Practical Guide to Selecting a 50kV Partial Discharge Test System

Power-frequency PD test system brings together an oil-immersed test transformer, automatic control console, digital PD detector, isolation transformer, coupling capacitor, and protective resistor. It is intended for laboratory and factory testing where both AC withstand testing and partial discharge measurement are required.

Διαβάστε περισσότερα »
Τεχνική

How Do VLF Withstand, Tan Delta, Partial Discharge and Insulation Resistance Tests Differ?

VLF withstand, tan delta, partial discharge and insulation resistance tests examine different aspects of a cable system. Withstand assesses survival of specified electrical stress; tan delta measures overall dielectric-loss behavior; PD examines detected localized discharge activity; insulation resistance evaluates a defined DC response. Select them for complementary questions. A favorable result from one method does not automatically replace another required measurement or cancel a valid concern from a different method.

Διαβάστε περισσότερα »
Χωρίς κατηγορία

What Does a Transformer Turns Ratio Tester Measure, and Which Faults Can It Miss?

A turns ratio tester assesses transformation behavior under defined test conditions; it does not certify the entire transformer. Verify the ratio definition, tap basis, connections, and measurement validity before interpreting a deviation. Use satisfactory results within their documented scope, and select complementary evidence when the question concerns insulation, contacts, mechanical condition, or an unexplained service event.

Διαβάστε περισσότερα »
Company New

Main Transformer and Switchgear Field Testing at the PV Project’s 220 kV Step-Up Substation

KV Hipot Power Equipment Co., Ltd. provides transformer testing, circuit breaker testing and high-voltage electrical test equipment for PV projects, electrical contractors and substation commissioning teams. Contact KV Hipot to discuss instrument selection and configurations based on your assets, test requirements and site power supply.

Διαβάστε περισσότερα »
Τεχνική

Pre-Commissioning vs Commissioning: Electrical Tests, Acceptance Criteria, and Energization Readiness

Electrical pre-commissioning verifies that installed equipment is ready for the next approved testing or energization stage. Commissioning verifies that the equipment and interconnected systems perform their intended functions. Commissioning includes activities before energization, during controlled energization, and under operating conditions.

Διαβάστε περισσότερα »
Τεχνική

What Is a VLF Tan Delta Tester, and What Can It Tell You About Cable Insulation?

A VLF tan delta tester provides system-level dielectric-loss evidence. Use it to establish documented behavior, compare genuinely comparable records, and direct further investigation when the evidence warrants it. Before accepting a conclusion, verify the measurement boundary, the equipment’s supported conditions, and the interpretation basis. The most useful outcome is a justified next action for the identified circuit, with a clear statement of what the test has and has not established.

Διαβάστε περισσότερα »
Τεχνική

Which Technical Specifications Determine the Performance of a VLF Hipot Tester?

Evaluating a VLF hipot tester requires prioritizing continuous capacitive load capability (µF at 0.1 Hz) over mere open-circuit test voltage. Match your required IEEE 400.2 withstand levels with pure sinusoidal waveform purity, fine current resolution, automatic frequency adaptation, and fail-safe discharge systems. Before purchasing, verify manufacturer load-derating curves against your longest installed cable circuits to guarantee reliable field performance.

Διαβάστε περισσότερα »

Ερώτηση Τώρα