Product

How to Work with Us ?

To get started, please share the detailed specifications of your requirements. Our professional sales engineers are available 24/7 to assist you with any questions. Feel free to reach out to us via email, phone, or by visiting us in person.

Frequently asked questions

We are professional test equipment manufacturers which have our own R&D team, production workshop, quality control system and marketing depart

We offer 12 months warranty and lifelong maintenance. The warranty applies to the original purchaser that the equipment will be free of any defect in materials or workmanship for a period of one year from the date of purchase. The warranties only cover defects arising under normal use and regular service, excluding any faults and damages resulting from abuse misuse, alteration, improper installation, neglect or adverse environmental condition, not from quality problem.

Normally the delivery time is about 15 working days after payment. For some special customized products, it will takes 15 – 30 working days depending on technical parameter of customer requirement.

Contact Us

Email: info@kvhipot.com
TEL: +86 18062060691
WhatsApp: +8618062060691

OR

400V 200kW AC Load Bank AC-4020

AC load bank loading test preventative maintenance of such power supply systems could free you from power supply failure, to ensure constant uptime for your power systems and make you prepared for anything. Downtime could also be reduced by regular maintenance and thorough inspections which are the key to power supply systems maintenance.

Products Details

الوصف

Overview

AC load banks are used for many power supplies load bank testing to ensure that the standby power supply system say UPS(uninterrupted power supply), battery bank, generator, transformers, inverter etc which especially located in harsh, dusty or corrosive environment working in good condition, when you need them most, if switched to be loaded when the main power supply in maintenance procedure or stop abnormally.

AC load bank loading test preventative maintenance of such power supply systems could free you from power supply failure, to ensure constant uptime for your power systems and make you prepared for anything. Downtime could also be reduced by regular maintenance and thorough inspections which are the key to power supply systems maintenance.

Technical parameter

 

Model 400V-200KW  Resistive AC Load Bank
Load Element Alloy resistors
Load Voltage AC400V(±10%) 3phase 4wire, 50/60Hz

Star connection

Load Power 200KW for AC400V 3phase 4wire, 50/60Hz Star connection
Load Steps

@AC380V 3P4W

Load Steps (three phase controlled):

1KW/2KW/2KW/5KW/10KW/20KW/20KW/40KW/50KW/50KW

(1KW-200KW adjustable)

Power Factor PF=1
Load Accuracy ±5%
Digital Meter Voltage, Current, Power, Frequency and etc.
Power Supply 230V 50Hz, single phase
Control Mode Manual control by push button
Wire Connections Copper bus bar for wire connections
Insulation Class F
Protection Level IP20(indoor use)
Fan Noise ≤75dB
Cooling Mode Force-air cooling
Work Mode Continuous work
Protections Overheating/buzzer alarm, overheating/over voltage protection, emergency stop button
Ambient Temperature -10℃~+50℃
Dimension 700*800*1350mm
Weight 300KG
Mobility Four wheels, lifting rings in chassis top
Humidity ≤95%
Altitude ≤2500 meters
arArabic

Inquiry Now